PMP® Challenge Question – 9/1

Our 8/15 challenge asked — in an organization, who is responsible for quality? The answer is the whole organization! The Project Manager has the responsibility to ensure there is a plan for quality of the project, but each team member is also responsible for checking their own work. Senior management has the responsibility for quality in the organization as a whole. Work needs to meet the requirements and testing should be done prior to completion of each deliverable.

For our next challenge, can you name at least 6 communication blockers? See you on 9/15 with the answer.

PMP® Challenge Question – 8/15

Before we look at a new question, let’s take a look at the answer to the 8/1 challenge. In it, I stated that many PMI components have some controls or policies in place to prevent preferential treatment to active volunteers at the expense of the general membership. For larger components with more procurement needs, the challenges include providing fair treatment for all stakeholders, including minorities, veterans, volunteers, and members. What is one significant way to conduct the procurement to provide an unbiased opportunity for everyone?

There are several variations we can build into a procurement process to make it more fair, as well as ensure we pick the best vendor. First, this includes developing a good set of criteria, possibly weighted, which will be used to evaluate the responses. There still may be bias if the evaluators know who applied, so a blind evaluation might be the next step. This means removing references to the bidder from the materials so a completely unbiased evaluation can be completed.

Now here’s a new question: In an organization, who is responsible for quality?

Reviews are Required

I’ve noticed a growing trend in a counter-productive behavior — skipping a review and rushing into execution. The usual excuse is “it slows things down”. The price you pay, however, is you may build the wrong thing and really slow things down. Many years ago I worked for a computer manufacturer. They aggressively decided to build a new system in parallel with developing the operating system — this wasn’t the norm in those days. The lack of an appropriate review let a major showstopping issue through — while the programmers were numbering the bits in one direction, the hardware designers were going in the other. This wasn’t uncovered for months, and many more months were wasted reviewing the code and correcting it after the damage was done. In the end, another manufacturer cornered the market and the system never went into manufacturing.

The Siebel Systems Expert Services team used to have at least a dozen different types of reviews available for customers to protect their project timelines and the value of their software purchase. I can recommend three basic reviews to consider for any project:

  • Status: Where are we with respect to schedule, cost, performance, and scope? Perform this review periodically (usually weekly) or at least at regular intervals.
  • Design: Does it meet spec? User friendly? Can we actually build it? Perform this review at least after the functional requirements are written.
  • Process: What are we doing well? What needs to be improved? Perform this review for longer projects or in between short projects.

In fact, each major step should have some form of review if for no other reason than to verify the scope and the quality of the deliverable. If you are not sure how to conduct reviews, I can highly recommend the work of Dan Freeman and Gerry Weinberg. Their original work, published in 1977 was the Ethno Technical Review Handbook (EthnoTech Inc.). In 1990 they updated this work with the Handbook of Walkthroughs: Inspections & Technical Reviews (Dorset House).

So next time you have an important project, as you plan, plan on having some reviews at the right time to ensure your project is successful.

Flying 300 Miles to Correct an Error!

OK … thought it might be time to repeat this story. I frequently use it in my PM classes as an object lesson in detail and quality. It has a place in my IT classes as well, since it points out an age old issue. I hope you at least get a little chuckle from this one!

This goes back to the very late 70s and early 80s. I was working on a project with an advanced concept for the time. The product we were developing needed to run equally well on any major IBM platform. At the time we selected the 360/370 series running OS-VS, OS-MVS, DOS-VS, DOS-VSE, VM, and the older IBM System 3. Most of the code was in COBOL for ease of portability. Some of the code had to be in assembly language since we were dealing with communications channels specific to the systems. We obviously tried to limit the amount of this code to keep things simpler.

Things went very well during development and initial testing, but the full roll out was rocky to say the least. Finding available equipment to test all these combinations was a major problem. The OS versions were easy — the company owned the right platforms. For DOS and DOS-VSE, we finally contacted a number of service bureaus and found one that fit our budget. Our local IBM office was kind enough to lease us time on an IBM System 3, so we thought we were home free.

For those of you that aren’t familiar with it, the IBM System 3 was a strange beast. Its primary inputs consisted of punch cards and floppy disks. The punch cards weren’t very standard, however. They were tiny cards with three rows of punches — 96 columns arranged in rows of 32. This took a special key punch which made tiny round holes. I bought a special card box to hold the “master” copy we produced at the IBM facility. The local office only supported punch cards, so this became our primary medium.

This scheme worked fine, until we encountered a client in Detroit without a card reader. Our local IBM office connected me with an IBM Data Center in Indianapolis where I could convert our master card deck on to a floppy disk. They even sent one of their local support people with me to assist. We tried running the job several times, but always got a warning on a certain card. Looking at a listing of the COBOL code, we saw a blank enclosed in quotes (” “). Thinking this was nothing out of the ordinary and needing to get over to the client, we packed up the newly made floppy disk and headed out. This was to be a simple, overnight trip.

Next day at the client site, everything installed and compiled smoothly. But getting the software to communicate was another issue. We were unable to connect to the communication channel. Traces showed we sent one message which was immediately rejected. We puzzled over this for hours. Then I remembered the card that kept giving us problems when copying to the floppy. I called up the programmer and had him take a look at the statement. Uh oh! Big trouble! The quotes actually enclosed a non-printable ASCII character which was an essential part of the initial handshake between computers. Had I looked at the actual punch card instead of the listing, I would have seen an odd punch combination it took special pains to make.

So now we had a fix — the programmer gave us an equivalent statement with the decimal value so it would be visible. But the client had no facility to edit the floppy disks. Next day we hopped on a plane and flew back to Indianapolis (about 300 miles). We fixed up the cards, copied them to floppy again, then went back to the customer. Success! Everything went without a hitch.

Now there are several lessons learned here, so be careful not to miss any! These mistakes cost an extra flight for two and turned an overnight trip into three or four days. First, set a programming standard prohibiting non-printable characters in quotes in the code. These are too easy to overlook. Next, whenever testing text files, always check the file for non-printable characters. I was hit by this one again a few months ago due to a programming error. Dumping the file in hex showed the offending character. Also, look at the actual source, not the copy. Had we looked at the punch card the first time, we might have caught this before leaving the Data Center. And finally, always be prepared for the unexpected! This was so long ago, I don’t recall what I did for clothing the extra days — I’m sure I had to buy an extra shirt or two while on the road.

Past Articles

Links and Buttons

Add to Technorati Favorites



Blogging Fusion Blog Directory

San Diego Blog News

Submit Express Inc.Submit Express - SEO Services

Disclaimer

All opinions on this blog are those of the site owner and do not reflect the opinion of any other entity. Information on this site may contain errors or inaccuracies; The Project Notebook does not make warranty as to the correctness or reliability of the site's content. If you believe something on this site is inappropriate and should be removed, please contact the site owner at sdcapmp at aol dot com.

Notices

"PMP" is a registered mark of the Project Management Institute.

Copyright

© 2010-2012 Ray W. Frohnhoefer, MBA, PMP, CCP