PMP® Challenge Question – 2/1

Welcome to the next PMP® Challenge Question Challenge!

As before, you will need to answer two of the next three (2/1, 2/15, and 3/1) challenge questions correctly. Email your answers to sdcapmp@aol.com no later than midnight, March 5th. In the event of a tie, there will be a random drawing.

The prizes:
Grand Prize: a complete set of PMP® study materials – book, CD, and Mind Map card from Crosswind Project Management.
Runner Up Prize: Prepare for the PMP® Exam card from Value Based Project Management

Our first challenge will be a little more subjective in nature. I’m looking for two advantages and two disadvantages for using the contract types of fixed price, cost reimbursable, and time and materials, presented in tabular form.

Good luck with the challenge!

Short URL: http://bit.ly/fkmzla

Category: PMP® Challenge Question

Tagged: ,

Leave a Reply

Past Articles

Links and Buttons

Add to Technorati Favorites



Blogging Fusion Blog Directory

San Diego Blog News

Submit Express Inc.Submit Express - SEO Services

Disclaimer

All opinions on this blog are those of the site owner and do not reflect the opinion of any other entity. Information on this site may contain errors or inaccuracies; The Project Notebook does not make warranty as to the correctness or reliability of the site's content. If you believe something on this site is inappropriate and should be removed, please contact the site owner at sdcapmp at aol dot com.

Notices

"PMP" is a registered mark of the Project Management Institute.

Copyright

© 2010-2012 Ray W. Frohnhoefer, MBA, PMP, CCP